It consists in a series of prefabricated concrete slabs that are constructed with a crane on a concrete deck that acts as a support base and levelling element. It guarantees a correct fixing and levelling. The sealing is perfect. It enables the construction of recordable pools.SYSTEM 10: STREAMLINE AND IMPROVE THE CONSTRUCTION OF OVERFLOW PUBLIC POOLS